Design

The Bridge at Q’eswachaka / Smithsonian NMAI


Every year, local communities on either side of the Apurimac River Canyon use traditional Inka engineering techniques to rebuild the Q’eswachaka Bridge. The entire bridge is built in only three days. The bridge has been rebuilt in this same location continually since the time of the Inka — via Youtube

Share this Story
Load More Related Articles
Load More In Design

Leave a Reply

Your email address will not be published. Required fields are marked *

Photos from Flickr